SRF Aquatic Area Closures July 7 – July 11
Introduction
The SRF Aquatics area will undergo scheduled maintenance the week of July 7 to address tile repairs in several locations, including the SPA, pool deck, and corridor leading from the locker rooms. This work is necessary to replace cracked and missing tiles and improve overall safety and appearance.
Scheduled Closures:
- SPA: Closed July 3–11 for drying, regrouting of the stairs, and tile replacement.
- Pool Corridor (hallway between locker rooms and Aquatics area): Closed July 7–11 for tile repair work.
- Entire Aquatics Area (Pool, SPA, Steam Room, and Sauna): Closed July 8–10 to allow for tile repairs around perimeter of pool and deck.
During this time, the SFC Pool will remain open and available for use during its regular hours of operation.
SFC Pool Hours:
- Monday-Friday: 6 a.m. – 9a.m., 11 a.m. – 2 p.m., and 4 p.m. – 7 p.m
- Saturday-Sunday: 10 a.m. – 5 p.m.
We appreciate your understanding and patience as these important updates are completed.
Modified on July 03, 2025